NUMBERED TECHINICAL DOCUMENTS

1. Miami-Dade Notice of Acceptance #08-0304.01
2. Florida Building Code Approval
3. Factory Mutual Approval Guide
4. Factory Mutual Approval - TWIN LOC-NAIL BASE SHEET AND RECOVER BOARD FASTENERS IN CEMENTITIOUS WOOD FIBER DECK ROOF CONSTRUCTION. SEPTEMBER 14TH, 1999
5. Factory Mutual Approval – TWIN LOC-NAIL INSULATION FASTENERS IN CEMENTITIOUS WOOD FIBER DECK ROOF CONSTRUCTION & POURED GYPSUM DECK REROOF CONSTRUCTIONS. JANUARY 4TH, 2000
6. Factory Mutual Approval – TWIN LOC-NAILS FOR THE FASTENING OF POLYISOCYANURATE ROOF INSULATIONS AND VARIOUS RECOVER BOARDS IN CEMENTITIOUS WOOD FIBER AND GYPSUM ROOF DECK CONSTRUCTIONS. MARCH 26TH, 2003
7. Factory Mutual Approval – TWIN LOC-NAILS, FM-260 BASE PLY FASTENERS, FM-245 BASE PLY FASTENERS, VARIOUS BASE SHEETS AND VARIOUS ROOF COVERS IN LIGHTWEIGHT INSULATING CONCRETE DECK ROOF CONSTRUCTIONS. JANUARY 31ST, 2006
8. Factory Mutual Approval – TWIN LOC-NAILS, FM-90 ASSEMBLED BASE PLY FASTENERS, FM-260 BASE PLY FASTENERS, FM-260 V BASE PLY FASTENERS, FM-245 BASE PLY FASTENERS, FM-245 V BASE PLY FASTENERS, VARIOUS BASE SHEETS AND VARIOUS ROOF COVERS IN LIGHTWEIGHT INSULATING CONCRETE DECK ROOF CONSTRUCTIONS. May 19th, 2006
9. Factory Mutual Approval – NEW PRODUCT, FM-290 ASSEMBLED BASE PLY FASTENER, AS EQUIVALENT PRODUCT TO FM-90 AND ASSOCIATED VERSIONS THEREOF, FOR BASE PLY TO LIGHTWEIGHT INSULATING CONCRETE, BASED ON PULL OUT TEST RESULTS IN 3024594. MARCH 11TH, 2008
10. FM Global Property Loss Prevention Data Sheets 1-29.
11. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail, Miami-Dade TAS 117(A) and 117 (B). March 7th, 2001
12. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail, Miami-Dade TAS 117(A) and 117 (B). September 20th, 2001
13. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail in Aged Lightweight Insulating Concrete. November 21st, 2001
14. Exterior Research & Design, L.L.C.
Trinity Engineering Letter – Letter to “Commercial Roof Membrane Manufacturers” inviting them to integrate our testing with the Twin Loc-Nail into their own Factory Mutual Approvals. Also provides fastener performance calculations. December 28th, 2001
15. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Withdrawal and Pull-Through Performance Testing of ES Products FM-260 and FM-260 V Fasteners in accordance with TAS 117(A) and TAS117 (B). March 14th, 2006
16. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Rupture Testing of ES Products FM-290 Fastener in accordance with TAS 117 (B). March 28th, 2008
17. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 1.8” TWIN LOC-NAIL IN GYPSUM ROOF DECK. February 7th, 2002
18. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 2.8” TWIN LOC-NAIL ATTACHING INSULATION OVER A GYPSUM ROOF DECK. April 22nd, 2002
19. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 1.8” TWIN LOC-NAIL IN CEMENTITIOUS WOOD FIBER DECK. July 26th, 2002
20. AMERICAN NATIONAL STANDARD – Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners. Instructions and Forms included.
21. Material Safety data Sheets
22. Com-Ten Industries – Hand Operated Digital Fastener Tester, Specification Page and Instructions.
23. Pull Test Request Form *only provided when ES Products fasteners are being used.
24. General Terms and Conditions of Sales