NUMBERED TECHINICAL DOCUMENTS

1. Miami-Dade Notice of Acceptance #08-0304.01
2. Florida Building Code Approval
3. Factory Mutual Approval Guide
4. Factory Mutual Approval - TWIN LOC-NAIL BASE SHEET AND RECOVER BOARD FASTENERS IN CEMENTITIOUS WOOD FIBER DECK ROOF CONSTRUCTION. SEPTEMBER 14TH, 1999
5. Factory Mutual Approval – TWIN LOC-NAIL INSULATION FASTENERS IN CEMENTITIOUS WOOD FIBER DECK ROOF CONSTRUCTION & POURED GYPSUM DECK REROOF CONSTRUCTIONS. JANUARY 4TH, 2000
6. Factory Mutual Approval – TWIN LOC-NAILS FOR THE FASTENING OF POLYISOCYANURATE ROOF INSULATIONS AND VARIOUS RECOVER BOARDS IN CEMENTITIOUS WOOD FIBER AND GYPSUM ROOF DECK CONSTRUCTIONS. MARCH 26TH, 2003
7. Factory Mutual Approval – TWIN LOC-NAILS, FM-260 BASE PLY FASTENERS, FM-245 BASE PLY FASTENERS, VARIOUS BASE SHEETS AND VARIOUS ROOF COVERS IN LIGHTWEIGHT INSULATING CONCRETE DECK ROOF CONSTRUCTIONS. JANUARY 31ST, 2006
8. Factory Mutual Approval – TWIN LOC-NAILS, FM-90 ASSEMBLED BASE PLY FASTENERS, FM-260 BASE PLY FASTENERS, FM-260 V BASE PLY FASTENERS, FM-245 BASE PLY FASTENERS, FM-245 V BASE PLY FASTENERS, VARIOUS BASE SHEETS AND VARIOUS ROOF COVERS IN LIGHTWEIGHT INSULATING CONCRETE DECK ROOF CONSTRUCTIONS. May 19th, 2006
9. Factory Mutual Approval – NEW PRODUCT, FM-290 ASSEMBLED BASE PLY FASTENER, AS EQUIVALENT PRODUCT TO FM-90 AND ASSOCIATED VERSIONS THEREOF, FOR BASE PLY TO LIGHTWEIGHT INSULATING CONCRETE, BASED ON PULL OUT TEST RESULTS IN 3024594. MARCH 11TH, 2008
10. FM Global Property Loss Prevention Data Sheets 1-29.
11. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail, Miami-Dade TAS 117(A) and 117 (B). March 7th, 2001
12. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail, Miami-Dade TAS 117(A) and 117 (B). September 20th, 2001
13. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Performance Testing ES Products Twin Loc-Nail in Aged Lightweight Insulating Concrete. November 21st, 2001
14. Exterior Research & Design, L.L.C.
Trinity Engineering Letter – Letter to “Commercial Roof Membrane Manufacturers” inviting them to integrate our testing with the Twin Loc-Nail into their own Factory Mutual Approvals. Also provides fastener performance calculations. December 28th, 2001
15. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Withdrawal and Pull-Through Performance Testing of ES Products FM-260 and FM-260 V Fasteners in accordance with TAS 117(A) and TAS117 (B). March 14th, 2006
16. Exterior Research & Design, L.L.C.
Trinity Engineering Laboratory Report – Rupture Testing of ES Products FM-290 Fastener in accordance with TAS 117 (B). March 28th, 2008
17. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 1.8” TWIN LOC-NAIL IN GYPSUM ROOF DECK. February 7th, 2002
18. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 2.8” TWIN LOC-NAIL ATTACHING INSULATION OVER A GYPSUM ROOF DECK. April 22nd, 2002
19. IRT-ARCON INC. – 12’ x 24’ SIMULATED UPLIFT PRESSURES RESISTANCE TEST OF ROOF SYSTEMS ASSEMBLY REPORT FOR ES PRODUCTS. 1.8” TWIN LOC-NAIL IN CEMENTITIOUS WOOD FIBER DECK. July 26th, 2002
20. AMERICAN NATIONAL STANDARD – Standard Field Test Procedure for Determining the Withdrawal Resistance of Roofing Fasteners. Instructions and Forms included.
21. Material Safety data Sheets
22. Pull Test Request Form
23. Liability Form
24. General Terms and Conditions of Sales